I got some more of those last minute chores done this morning.I took a load of trash and yard debris to the land fill and then cut some more grass. Went out to get the mail and saw the mailbox post was about rotted through at round level so that was one more thing to fix before I leave next Thursday.
Took five foot piece of 6" schedule 40 PVC and installed a closet flange on one end and attached the mail box to it...put the PVC two foot into the ground and cemented it in...should last a while now I reckon.
Just about done with everything. Sweetthing is loading the trailer this weekend and I hope to be pulling out early Thursday morning.

0 Yorumlar